    Connecting validation requirements, tests and evidence

    By BiggsB Global · Published

    Validation evidence is only convincing when a reviewer can follow it from why the asset or system exists to the decision to release it. This guide sets out that chain, who usually owns each link and what to check when something changes.

    The chain

    • Intended use: what the asset, process or system is for and its boundaries
    • Requirement: a testable statement of what it must do
    • Risk: what could go wrong and how much it matters to product quality, patient safety or data integrity
    • Test: the activity that shows the requirement is met, sized to the risk
    • Executed result and evidence: what actually happened, recorded objectively
    • Deviation resolution: what differed from expectation, why, and what was done
    • Review and release decision: an accountable person's approval based on the whole chain

    Illustrative traceability table

    Illustrative only, not a client result.

    Illustrative traceability rows
    RequirementRiskTestResultDeviation
    System records who approved each batch record and whenHigh: data integrityScripted test of approval and audit trailPass, screenshots attachedNone
    Equipment holds set temperature within the specified rangeHigh: product qualityOperational qualification run across the rangeHeld for impact assessment and QA dispositionDEV-01: sensor calibration found overdue; affected prior results assessed, valid calibration restored and justified retesting performed before QA disposition
    Report export uses the company template (nonregulated presentation only)Low, assuming the report is not used for GxP decisions or recordsUnscripted checkPassNone

    Who owns what

    • Business or process owner: intended use and requirements
    • Validation or engineering: risk assessment, test design and traceability
    • Testers and operators: execution and evidence
    • Quality unit: deviation approval, review and release

    When something changes

    Start from the change, trace it to the requirements and risks it touches, and use a documented change-impact and risk assessment to determine the retesting, regression coverage and other evidence needed before release. Keep the trace current so the next reviewer sees the same chain.

    Handover questions

    • Can every high-risk requirement be traced to executed evidence?
    • Are all deviations closed or formally accepted?
    • Who maintains the trace after go-live?
    • Which procedures cover change control and periodic review?

    Software such as RegForge can keep requirements, tests and evidence linked, but it does not replace physical tests on equipment or the human review and approval of results.

    BiggsB builds and reviews traceable validation evidence for computerized systems and CQV projects. Release decisions remain with the client's quality unit.

    Sources

    Speak with an advisor

    Describe the decision or project in front of you. Your inquiry goes to the advisor team for the service you choose.